One Kerrisdale
An 11 unit boutique apartment building located in the heart of the Kerrisdale neighbourhood with three CRU units on the main level to fill the need of additional retail space needed for this area. This four level concrete building was designed with all the modern amenities in mind and was ready for occupancy just at […]
UBC Engineering
Replacing UBC’s Dairy Research building is this addition to one of UBC’s founding faculties, Applied Science. The undergraduate engineering students will benefit from the new computer labs, meeting rooms, and student society offices housed in the project. Planning and installation of the conduit raceways (feeders and branch wiring) proved a major challenge in the structure […]
Trinity Western University – Richmond
Trinity Western University has expanded into downtown Richmond with their newest campus located in the Quintet Phase II complex. The project consists of 2 lecture halls, 11 classrooms, student study areas, and facility offices. Working to new City of Richmond energy utilization targets the project achieved LEED Gold certification. To achieve this target lighting control […]
Brentwood Early Works
This critical pre-construction phase to the Brentwood Mall redevelopment involved demolition of some of the existing mall structure with new infrastructure being put in place for future mall tenants. Work was often completed during night shifts to accommodate a zero interruptions to mall operation mandate. This often required extensive preplanning and coordination with EllisDon and […]
UBC Thunderbird Stadium
This project completed the removal and replacement of stadium lighting on top of 60 year old concrete poles which were over 100ft high. Lazer technology was used to achieve the accuracy of the aiming of the lights to achieve a uniformed light level on the field with out shadowing.
Stratford Hall Middle Years Program

Thorough planning and careful execution were required to seamlessly blend the electrical installation with the architectural design features. The open concept coupled with interior glass or custom millwork walls presented many unique challenges.
Children’s & Women’s Health Centre Clinical Support Building
Coming Soon
The Kimpton
Coming Soon
SFU Shrum Chemistry Building Renovation
Shrum Chemistry Renew represents one of the first opportunities to renovate a SFU campus building dating back to Simon Fraser University’s inception in the late 1960’s. Challenges were faced with the seismic upgrading on the original portion of the project and with the aggressive 16 month schedule. Compounding the difficulty was that the existing building was […]
UBC Old Auditorium Renovation

Combining resources from all departments, Bridge Electric pulled together the right team to meet the needs of the UBC Old Auditorium Renovation. For many electrical contractors, the prospect of renovating an 80 year old wood building with solid walls and floors and a “go live” date just 18 months after groundbreaking might be deemed an […]
Fairmont Pacific Rim Hotel and Residences

The Fairmont Pacific Rim project was challenging from the beginning, with only 30% of the design completed when the project started and a fixed completion date – with a fully booked hotel for the 2010 Winter Olympics!
The Wesbrook Residence

In the fall of 2007, Bridge Electric Corp. was selected by Ledcor Construction Company as the electrical contractor for The Wesbrook project. Located on the edge of 700 hectares of unspoiled natural forest, in a new sustainable community at UBC campus, The Wesbrook was built using “green” construction practices and infrastructure.
UBC Buchanan Building – Block B
The third building (out of four) in the Buchanan Complex to be renovated as part of the UBC Renew Project, in partnership with the Province of British Columbia. The 45,000 ft² building, spread over three floors, was constructed to achieve a LEED Gold certification. Block B contains 25 classrooms, 4 lecture halls, and 2 computer […]
YVR International Arrivals

The new International Arrivals Hall was born of the need to provide a visually welcoming space with 24 hour passenger assistance.
Features of the project include a “Log Jam” lighting arrangement as you exit the customs hall. In front of the rock wall feature, you will see canoes travelling down a river made of LED lighting and drywall bulkheads.
Child & Family Research Institute
The Child & Family Research Institute (CFRI) is committed to world-class research spanning a wide range of children’s and women’s health concerns. It is the largest research institute of its kind in Western Canada. The research institute has both “wet bench” laboratory and “dry lab” clinical research areas, and other areas to facilitate particular fields […]
UBC Friedman Building
One of the seven buildings selected for renovation as part of the UBC Renew Project, in partnership with the Province of British Columbia. The 63,000 ft² building spread over 4 floors is home to the School of Rehabilitation Sciences and the School of Audiology; containing teaching and research labs and office space for the users. […]
John M S Lecky UBC Boathouse

From the beginning, Bridge Electric placed a high degree of emphasis on pre-planning to streamline the entire construction process. Through numerous meetings with suppliers and other trades, careful review of shop drawings and optimizing the sequence of work, Bridge Electric was able to maintain the schedule and keep pace with the flow of work.
Langara College Library & Parkade
The Langara College Library building is a key component in the sustainable campus master plan, as developed by Teeple Architects Inc. The concept is to create a campus composed of interdependent indoor and outdoor learning centres. The building is situated to accommodate three new courtyards which are a focal point for campus life. By eliminating […]
Kwantlen University Trades & Technology Centre
The Kwantlen Trades & Technology Centre is a $42 million post secondary educational campus, located in Cloverdale, BC that provides 21 shops, 27 classrooms/labs, library/study, administrative office, and student and ancillary services. The building orientation and landscaping were developed to optimize the energy performance of the building and a Photovoltaic Solar Wall supplies a portion […]
Vancouver Transit Centre
This newly completed facility was designed and constructed as a replacement facility to the Oakridge Transit Centre located at 41st Ave and Oak Street. The facility features space for 400 total buses, including 172 diesels, 188 standard trolleys and 40 articulated trolleys. The office tower provides employee training spaces and a publicly accessible cafeteria via […]
UBC Chemistry & Biological Engineering Building

Bridge Electric’s services started in the fall of 2002 for coordination and pricing. Actual construction on-site started in the spring of 2004 with occupancy for the majority of the building in September 2005. Final occupancy of the Hydrogen Research Lab was in the spring of 2006.
BC Cancer Research Centre

The new BC Cancer Research Centre is a 15 storey building with distinctive architectural features including a 15 foot diameter petri-dish windows, coloured bar code style exterior panels which replicate the sequencing of human DNA, and a glass enclosed spiral staircase which symbolizes the DNA double helix.
The Crystal Mall

Multi-use complex with circular and elliptical grid layout, four levels of underground parking, full service Hilton convention hotel, indoor two level retail mall, multi-level office building, and high rise/low rise residential towers.