UBC Thunderbird Stadium

  • Vancouver Location
  • Pre-Engineered Project Type
  • N/A Project Size
  • UBC Properties Trust General Contractor
  • March 2014 Completion Date

Project Summary

This project completed the removal and replacement of stadium lighting on top of 60 year old concrete poles which were over 100ft high. Lazer technology was used to achieve the accuracy of the aiming of the lights to achieve a uniformed light level on the field with out shadowing.