Bridge Electric completed levels 3 through 10 on the multiple phased renovation of the UBC Buchanan Tower. The scope of work was a complete renovation of the power and lighting systems on each floor with a new lighting control system added to the tower. The first phase of work included a complete removal and re-installation of the fire alarm system while the tower remained occupied.