Regus (Spaces) – Gastown
A 7 level contemporary office building providing flexible workspace solutions for businesses that do not want to own or lease permanent offices. We performed a full electrical and telecom tenant improvement to an existing heritage building that was refreshed by the base building contractor. At the tail end of the project we also provided the […]
Canada Place North Point Plaza Redevelopment
Renovation of Canada Place’s North Point Plaza to a new modern feel has brought new LED lighting to the perimeter, landscaped spaces, and new seating areas. A new performance stage is ready with lighting and power to welcome any act to the stage.
Earls Ambleside

This 269 seat restaurant (including 80 on the large patio) is a departure from Earls’ traditional aesthetics. One of our major tasks was to incorporate the lighting into this new aesthetic to provide a unique feel to the restaurant. The other major task on the project was the modification and re-configuration of the existing 1,200A […]
MetroVancouver Head Office
This high end head office for MetroVancouver occupies the upper 16 levels of Metro Tower III. The location provides spectacular 360° views of the region this federation serves. Primarily an open office concept, each office level also consists of private offices, quiet rooms, meeting rooms, and a comfortable break room with kitchenette. The upper levels […]
Cactus Club
Following in the wake of their success with their landmark restaurants located at English Bay and Coal Harbour, Cactus Club has added a new high end location at Richmond Centre. As with the other locations, Bridge was responsible for installation of the distribution system, lighting, ASHREA compliant lighting control, audio-video-data pathways, and patio in-floor and […]
McDonalds Restaurant
The first ever McDonald’s built in British Columbia, opening in 1967, was scheduled for a major update. The update would require demolition of the existing structure with a new modern restaurant built in its place. The new restaurant would have a new main hydro service, new European designed lighting, a new automated kitchen, and a […]
Everything Wine

This project comprises new service equipment, lighting, lighting control, emergency & exit lighting, power, security and data systems.
Vancouver School of Music

This design build renovation involved the total replacement of the lighting, fire alarm, and lighting control system as well as adding new audio & video equipment.
CBSA FS‐LSI Facility

The new FS‐LSI Facility at the Pacific Highway Border Crossing is the first of its kind in Canada. It is designed for expedited scanning of large semi‐trucks and trailers by CBSA. This complex design‐build project features a 19‐foot tall moving x‐ray scanner and modern office space.
Central At Garden City
Central at Garden City is an outdoor mall located at the crossroads of Garden City and Alderbridge Way in Richmond, BC. It has over 50 retail stores throughout the 15 acre site and features a unique two level Walmart Supercentre as its primary anchor tenant. The mall also has Marshalls, DSW: Designer Shoe Warehouse, and Bed […]
Life Labs
The Life Labs Burnaby facility project consisted of renovations to approximately 20,000 square feet of laboratory services areas over 5 phases. Phasing of the work facilitated moving the various different departments into new state of the art facilities while minimizing the down time of that department. A key element to the work required that all […]
Steve Nash Fitness World

This new fitness facility includes the installation of lighting, power, ASHRAE compliant power and lighting controls, and low tension systems for audio, video, and data.
The Spot
The Spot is a brand new commercial/residential mixed use development by Shato Holdings. The project sits in the heart of Mount Pleasant across from Vancouver City Hall and on the former site of the White Spot restaurant, from which the project derives its name. The project consists of 120 residential units ranging from bachelor suites […]
LGM Office TI at MNP Tower
This project consisted of a 4-storey office fit-out for LGM, an automotive finance and insurance services provider. The interior design of this office featured many details that incorporated an automotive theme including items such as custom light fixtures designed to resemble a 6-speed gear shifter and a custom suspended lit sculpture in the shape of […]
H-Mart

This project involved a base building upgrade, that included demolition of the existing Mark’s clothing store, followed by the installation of the grocer’s electrical systems all on an aggressive 24 week schedule. We are happy to report that the all systems, including a 600A, 600V distribution upgrade with 500 foot feeder, were completed “On Time”!
Walmart (Tsawwassen)

This new build Walmart store at Tsawwassen Commons is a slab on grade store with steel construction. A short construction schedule during the winter months made this a tough project, however Bridge provided double shifts and completed “On Time” and the store opened as planned at the end of January.
Equinox Fitness – Vancouver

Equinox is a state of the art luxury fitness club in the heart of the Vancouver’s downtown core. This location (their first in BC) offers a diverse range of fitness options including barre3, cardio, treadmills, cycling, and yoga. The facility not only offers some of Vancouver’s best gym equipment – it also offers luxurious steam rooms, […]
BC Housing SRO Renewal Initiative

We completed eight building renovations as part of BC Housing’s SRO Renewal initiative to renovate & restore 13 publicly owned single room occupancy hotels in the Downtown Eastside of Vancouver. Each building contained unique historical features that needed to be preserved or incorporated into the new design. The historical components, along with some of the […]
Hyatt Regency
This project completed renovations to the hotel’s public levels, bringing an entirely new image to one of Vancouver’s premier downtown hotels. The renovation brought new life to the main lobby & reception area, restaurant & bar, public areas, and all of their meeting & banquet facilities, which now totals 46,000 sq. ft. spread over three […]
Vancouver Olympic Village – Parcels 2 & 9
Coming Soon
Nordstrom
Nordstrom’s is a high-end retail store located at the old Sear’s site in Pacific Centre, Downtown Vancouver. It comprises of 3 levels, 230,000 ft² TI space with an emergency generator, distribution system, Siemens fire alarm, Wattstopper lighting control system, and over 11,000 light fixtures. In early August, just 1 month before opening, the project was […]
Pacific Centre Mall Redevelopment

The Pacific Centre Mall Redevelopment was a renovation to over 600,000 square feet of an iconic city block in the heart of downtown Vancouver’s premium retail district. The project consisted of demolishing the eight-story Sears tenant space and constructing the landlord’s space ready to accommodate new high-profile tenants. The project tied into the existing Pacific Centre Mall which remained operational during construction.
Guildford Town Centre Expansion
With over 1.2 million square feet of leasable retail space included in the renovation and expansion, the construction team was faced with keeping the mall operational and accessible to the public while completing this massive project. Bridge succeeded with the Expansion Grand Opening being delivered “on-time” and the balance of the renovation, demolition and parking […]
Holt Renfrew
The electrical contract for Holt Renfrew’s flagship store in Pacific Centre presented Bridge Electric with a number of challenges. At the top of the list was the customer’s non-negotiable grand opening date. Throughout the fast tracked construction process (construction was started with 25% complete drawings), Bridge Electric had to process and incorporate more than 1000 […]