UBC Buchanan Tower Upgrades UBC - Main Campus

UBC Buchanan Tower Upgrades

  • UBC - Main Campus Location
  • Pre-Engineered Project Type
  • 18,000 ft² Project Size
  • Kinetic Construction Ltd General Contractor
  • March 2020 Completion Date

Project Summary

Bridge Electric completed levels 3 through 10 on the multiple phased renovation of the UBC Buchanan Tower. The scope of work was a complete renovation of the power and lighting systems on each floor with a new lighting control system added to the tower. The first phase of work included a complete removal and re-installation of the fire alarm system while the tower remained occupied.